What is wastewater? |
|
Wastewater is the liquid waste that results from use of
water for domestic, commercial, industrial or
agricultural purposes. |
|
What is
the Wastewater project all about? |
|
It
will help establishing modern wastewater systems in
all the Wilayats of Muscat Governorate. This project
aims at maintaining public health for the people,
conserving ground water and contributing in
realizing an environment free from pollution in
addition to many other socio-economic benefits. |
|
How
much does the overall project going to cost? |
|
This project is one of the most important
infrastructure projects currently being implemented
and it started with a capital of RO/- 20 million and
the cost of the project reached 1.6 Billion Omani Rial. |
|
What
are the benefits of the projects? |
|
The project aims at providing health, environment,
economic, and social benefits. |
|
What
are the products of the Company? |
|
High quality treated water used for irrigational
purposes and fertilizers. |
|
What is the concept of treatment? |
|
Subjecting liquid waste to various physical,
chemical and biological processes in order to
eliminate all forms of pollution is called
treatment. |
|
How many stages of treatment are there? |
|
There are three stages of treatment: the Primary
Stage, the Biological Stage and the Final Stage of
Sterilization and Refinement. |
|
Which
areas in Muscat are included in the project? |
|
The project is divided into three geographical
stages:
Phase 1: Covers all areas and towns of Wilayat
Bousher and part one of Darseit.
Phase 2: Covers part one of Wilayat Alseeb, Wilayat
Alamirat, Wilayat Quriyat and part two of Darseit.
Phase 3: Covers part two of Alseeb, Albustan area
and Alhajir area. |
|
How
long will the construction period last? |
|
It
is expected to take ten years. |
|
What are the benefits of the project? |
|
The project aims at providing health, environment,
economic and social benefits. |
|
Is
treated water safe to drink? |
|
Although treated water is adequately refined and
sterilized, it is advisable not to use it for
drinking or bathing. |
|
How do I count the cost of connection and
service? |
|
The connection cost is decided by the size of the
building. The service cost is a percentage of the
water bill. |
|
What is
the membrane bio-reactor? |
|
The
membrane bio-reactor use tiny
membranes refine water
using very sensitive filters. |
|
How
many sewage treatment plants will be
established? |
|
Seven stations, in Darsiet, Alansub, Albustan,
Al Seeb, Alamirat, Quriyat and Alhajir. |
|
Do the
stations cause health or environment problems? |
|
The
company has taken adequate measures to prevent any
side-effects that might be caused by the STP.
Special equipment to treat odours has been installed
at the stations. |
|
The
treated water will be used for what purposes? |
|
The treated water will be used for watering
parks, sports fields and other green surfaces.
It will also find its way to private users. |
|
What is the STP? |
|
It
is the place where the sewage liquid reaches through
a network of pipes. The sewage liquid is then made
ready for reuse after undergoing a series of
chemical and biological treatments. |
|
Does
the company produce fertilizers? |
|
Yes, the by-product generated can be used to
produce fertilizers. |
|
What is
the geographical scope of the project ? |
|
The six wilayats of Muscat, Mutrah, Bousher,
Alseeb, Alaamirat and Qurayat. |
|
Will
the roads be affected while building the
network? |
|
The main roads will not be affected since we
will be employing special machinery to dig
deep under them. However some by-roads may be
affected by the digging operations. |
|
How
will buildings be connected to the network? |
|
The network will be connected to the last
manhole in the building. |
|
What
will happen to the existing septic tanks in
the buildings? |
|
When the building is connected to the network
these tanks will be rendered functionless. The
owners will then be free to treat them either
by burying or sterilizing. |
|
Who can
buy the company’s products? |
|
Any one including companies, factories and
layman too. |
|
On
implementing Muscat Wastewater Scheme project,
do tenants who are hiring flats / apartments
have to pay connection charges or any other
charges? |
|
Tenants are not supposed to pay for the
connection fees but they will have to pay the
monthly charges. |
|
Will
there be a separate bill for this bill along
with normal utility bills? |
|
It will be included in the water bill |
|
Where
is Oman Wastewater office? |
|
It is located in Al Khwair
P.o.Box. 1047
P.C. 133
OOSC Building |
|
I would
like to speak with concerned person for
further details, whom I should contact? |
|
Mrs.Nahida Al-Maskiry
Head of Customers Support
Tel: +968 24646100
Ext:100
Fax: +968 24693418 |
|
How to
participate in OWSC tenders and what is the
procedure? |
|
If the value of the tender is 250.000 Omani
Rial or less, then it will be announced
through the company it self, but if the value
is more, then the tender will be announced
through the Tender Board. |
|
How to
participate in OWSC tenders and what is the
procedure? |
|
If the value of the tender is 250.000 Omani
Rial or less, then it will be announced
through the company it self, but if the value
is more, then the tender will be announced
through the Tender Board.
For this matter you can contact the following
person:
Mr. Saleh Al Badi
Chief Financial Officer
Tel: + 968 24693412
Ext: 211 |
|
|