|
PREQUALIFICATION NOTICE
Haya Water is a Government of the Sultanate
of Oman owned entity, and is empowered to
build and operate the Muscat Wastewater
Project covering an area of 3,900 km2.
The company is currently executing a very
large infrastructure project to build
wastewater collection, treatment and reuse
system in the Muscat Governorate.
Haya Water intends to prequalify
contractors and/or firms for the project:
REHABILITATION AND UPGRADING OF THE EXISTING
SEWERAGE NETWORK IN RUWI SUB-CATCHMENT
It is expected that invitations for bid will
be made in November 2009.
Interested competent applicants may obtain
the Prequalification documents by sending a
request to the below mentioned Department
via email
tender@haya.com.om address
or Fax +968 24603084.
Applications for prequalification should be
submitted in sealed envelopes, delivered to
the address below by 14th
October 2009, and be clearly marked
“Application to Prequalify for
REHABILITATION AND UPGRADING OF THE EXISTING
SEWERAGE NETWORK IN RUWI SUB-CATCHMENT”.
Finance & Procurement Department
Haya Water
OOSC Building, 2nd Floor, Madinat
Sultan Qaboos
Muscat, Sultanate of Oman
Tel. 24643200, Fax 24603084, Email:
tender@haya.com.om
Website:
www.haya.com.om
PRE-QUALIFICATION FOR
REHABILITATION AND UPGRADING OF THE EXISTING
SEWERAGE NETWORK IN
RUWI SUB-CATCHMENT
SYNOPSIS OF THE SCOPE OF WORK
1.1
INTRODUCTION
1.1.1
As part of Muscat Wastewater Scheme Project,
Haya Water (Oman Wastewater Services Company
S.A.O.C.) is undertaking major wastewater
projects across the whole Muscat area to
construct new wastewater systems. Also,
there are some scattered existing wastewater
systems, as in Ruwi sub-catchment, which are
planned to be rehabilitated as part of
Muscat Wastewater Scheme Project.
1.1.2
The project scope of work is rehabilitation
and upgrading of the existing sewerage
collection system in the Ruwi sub-catchment.
1.2
PURPOSE OF THE PRE-QUALIFICATION
1.2.1
Haya Water intends to short-list suitably
qualified Contractors with necessary
experience and capabilities in the
rehabilitation of the existing sewerage
networks as well as the construction of new
sections of pipelines and some House
connections.
1.3
RESTRICTION ON APPLICANTS
1.3.1
Applicants with extensive regional and / or
international experience in the Construction
of Major Infrastructure Works (especially
construction and rehabilitation of the
sewerage networks) should only apply.
Applicants without such experience are not
encouraged to apply and their submission
will be ignored.
1.4
DESCRIPTION OF THE PROJECT
1.4.1
Project area includes Ruwi sub-catchment.
Ruwi area is part of Greater Mutrah Wilayat
and it is considered as one of the main
trade and business centers in Muscat
Governorate. Existing sewerage network was
constructed in 1978 and extended once in
1986.
1.4.2
Existing sewerage network in Ruwi is
connected to Darsait STP. Pipes materials
are uPVC and AC, diameters from 100 to 700
mm.
1.4.3
The objective of the project is to
rehabilitate and upgrade existing Ruwi
sewerage network to be able to service Ruwi
area up to the end of the design project
period (2035).
1.4.4
New sewerage system consists of two main
sub-systems, gravity network and sewer main
trunk. The main trunk will convey the
wastewater collected from Wadi Kabir
sub-catchment and the wastewater collected
from Ruwi sub-catchment up to Darsait STP.
1.4.5
During construction phase the Contractor
shall ascertain all local conditions
relevant to the Works and shall be
completely responsible for the detailed
design of house and property connections,
renovation works, rehabilitation works,
temporary works, traffic management, etc.
finalization of alignments and revisions to
tender details, supply, construction,
erection, testing and commissioning of the
complete sewerage system and sub-systems as
outlined hereinafter.
1.4.6
Detailed scope of work is provided in Part 2
of this document. Ruwi sub-catchment is
shown on Figure 1.
 |