TENDER # PR/2488/08
MODIFICATION OF EXISTING AL ANSAB CENTRAL
LABORATORY
SYNOPSIS OF THE PROJECT SCOPE
The scope of work for the modification of
Ansab Laboratory shall include but not be
limited to the following:
-
Demolition, Dismounting and Shifting
Works
-
Civil Works
-
Supply, fabrication and installation
works
-
Supply, Installation, and Commissioning
of Equipment/System and Ductworks
-
Gas supply and installation of Pipelines
-
Electrical supply and associated works
-
Water supply, Drainage system, Plumbing
and Other Mechanical Works
-
Re-painting
Any other related works which may be
required for the completion of the works
shall deemed to have been included in the
price quoted. Works other than that listed
above shall be inferred as related works
required to complete the works in the
opinion of OWSC.
Prior to
tendering, the contractor shall inspect the
project site, and assess the quantum of
work, nature of work to be carried out,
requirements of resources and any other
related works to be carried out to complete
the works and accordingly quote the lump sum
cost in the Bill of Quantities.
|