TENDER NO. T/02/2010
CONSTRUCTION OF BOUNDARY WALL AND STORM
WATER DRAINAGE SYSTEM AT MSQ (MADINAT SULTAN
QABOOS) STP
The tender document may be purchased by
Contractors registered with Tender Board
who have sufficient experience in the works
mentioned above, from the Contracting
Section, Finance Department.
Office location:
OOSC Building, 2nd Floor, Madinat
Sultan Qaboos
Office hours: 7.00
am to 12.30pm and 1.00 pm to 3.30 pm,
Saturday to Wednesday
Period of sale of
Tender Document 25.01.2010
to 08.02.2010
Tender Fee:
RO: 100.000 (Rials Omani One Hundred only)
Non-refundable
Payment method: Cash,
Demand Draft in favor of Haya Water (DD
shall be inclusive of banker’s commission by
the paying bank)
Bid validity: 90
days from date of submission
Bid Bond: 1%
of bid value, in favour of Haya Water valid
for 90 days from date of submission
Last date for submission
of Tender Bids:
1200 Hrs on 13.02.2010
Sealed Tenders along with all required
documents shall be placed in Haya Water
tender box with the tender title written on
the cover and without any identity of the
Tenderer.
SYNOPSIS OF SCOPE OF WORKS/SERVICES
1.0
INTRODUCTION
This Contract Scope of Work (SOW) is for the
Construction of Boundary Wall and
Drainage System at MSQ STP. It includes
civil, structural and electrical works as
specified in Section 7.
The structure of this SOW is bound to
confirm that the Contractor shall adhere to
the Haya Water policies, Health, Safety and
Environmental commitments, and to ensure
that the undertakings shall be safe and to
carry out according to the specified
standard quality.
2.0
DESCRIPTION OF
WORKS
a. The
work comprises the construction of
approximately 669 meter of Boundary Wall
including plaster and paints as per drawing
and site plan.
b. The
contractor shall prepare Shop Drawings which
include Wall Alignment, Height, Elevation
and mark at site the wall alignments for the
approval by HAYA or by the consultant
designated by Haya Water to supervise the
project.
c. Contractor
to construct 2Nos. of Wadi crossing as per
drawing, location of wadi crossing is
approximate. Actual Location and length will
be determined at site in liaison with Haya
Water.
d. Contractor
to construct a storm water channel in order
to collect the rain water and as shown in
the design drawings.
e. Contractor
to construct 2 Nos. Box culvert as per
location shown in the site plan and drawing.
f.
The contractor
to provide two cast aluminum gates of 5
meter wide and to HAYA approval.
g. Contractor
to make leveling in order to make sure that
all rain water goes towards the proposed
wadi channel.
h. Contractor
shall excavate the site after getting permit
from HAYA and shall take necessary
precautions to avoid any damage for the
existing services (cables, pipes).
i-
Contractor to provide electrical panel for
the boundary wall lighting system. |